Now that we don’t have to focus on getting the house ready to sell, we can turn our attention back to Pegu Club. With splash planned for the end of next month, it’s not a moment too soon!
This past weekend was bitterly cold with highs in the 20’s and low 30’s – not good boat work weather. However, we did want to check on Pegu Club and take stock of what we need to do over the next six weeks, so we bundled up and drove down to Shenny.
All looked well with Pegu Club. A Softsoap container in the head had cracked from the below-freezing temperatures over the winter (that’s going to be one clean countertop), and we saw that we had narrowly avoided a minor flood from a 2 gallon jug of water. It had frozen solid, and with no real room to expand the side was bulging and cracked. Jeff said it’s a good thing it hadn’t thawed, because 2 gallons of water would have poured all over the floor. Lesson learned.